Heat dissipation helper for the data center ——Perforated Cable Tray

Release time: 2022-10-18

With the rapid development of the times, the requirements for information transmission, storage and processing capabilities are getting higher and higher. As a platform for supporting information applications, data centers will play an increasingly important role. Many users spare no expense to build new data centers, and the scale and specifications of data centers are constantly expanding and improving, which puts forward higher requirements for data center management.Just happened to have the appearance of the perforated Cable Tray from Vichnet.

perforated cable tray

The perforated cable tray is a semi-sealed bridge, which is very similar to the cable trunking. It is punched at the bottom or side for heat dissipation. It is mainly used for water laying or vertical laying of control cables and communication cables. Because the needs of customers are different, Vichnet can carry out surface treatment according to the actual requirements of customers.

The perforated Cable Tray features:
1. The weight of the perforated cable tray is relatively light. The load it can bear is relatively large, and the shape is beautiful.
2. The structure of the perforated cable tray is relatively simple. It is also very convenient and quick to install. However, the surface treatment of the perforated cable tray is divided into two treatment methods: crossing and painting, so in some relatively corrosive environments, special anti-corrosion treatment is required.
3. Good heat dissipation performance. The bottom of the perforated cable tray has many waist-shaped holes, so that its heat dissipation performance is much better.

Let's take a look at specific cases from Vichnet:
JD North China (Langfang) Cloud Data Center Base
Address: North of No. 3 Road, West of Tongxi Road
Scale: The total investment is 12.74 billion yuan, covering an area of 130 acres, with a total construction area of about 173,160 square meters, including four data centers: each with an area of 40,000 square meters and an office building with an area of 13,160 square meters. The project covers an area of about 86,580 square meters (130 acres), and mainly builds cloud computing + big data infrastructure platforms, power supply and distribution facilities, refrigeration facilities, IT service cabinets, and server equipment. After completion, there will be 10,560 cabinets.

JD North China (Langfang) Cloud Data Center BaseJD North China (Langfang) Cloud Data Center Base

An orderly wiring system, as the basis for the operation of the data center network, is also an important part of the data center system. The wide application of perforated cable tray makes the security of data room better and better.



Prev:Main Points of Installation Process of Cable Tray
Next:The Leader Of Ningbo Overseas Chinese Federation Inspect VICHNET