Pengding Data Center Construction Project

Pengding Data Center Construction Project: The Pengding Times Building project occupies a land area of 9,307 square meters, with a total construction area of 129,598 square meters. The data center of this project utilized Vichnet Technology’s 304 stainless steel mesh cable tray for wiring. This project serves as a classic example of leveraging the flexibility of mesh cable trays for on-site adaptive installations. In situations with significant cable needed towards different directions, the mesh cable trays are directly bent outward at a 90° angle for the bottom routing.

Get Your Quote Now

Fill out the form belows, and we will be in touch shortly.